Conveyor Belt 150 ton/h

Project, Manufacturing and Installation of 150 ton/h Conveyor Belt - Complete Turn-Key

  • Client: Pronave Group
  • Location: São José dos Campos, SP
  • Period: 2020 (2 months)
  • Category: INDUSTRIAL / TURN-KEY

CONTEXT

After the ETM renovation, Pronave Group entrusted a new project: a conveyor belt to transport 150 ton/h of soda ash.

THE PROPOSAL: TURN-KEY (EPC)

“We do it all: project, manufacturing, installation, commissioning.”


EPC SCOPE


E – Engineering:

  • Conceptual and basic design
  • Sizing (capacity, power)
  • Detailed engineering
  • Calculation report and ART

P – Procurement:

  • Material acquisition
  • Supplier management

C – Construction:

  • Structure manufacturing
  • Installation
  • Commissioning


DEVELOPMENT

  1. Technical visit (survey)
  2. Conceptual design
  3. Detailed engineering (calculations, drawings)
  4. Manufacturing (metal structure, component integration)
  5. Field installation
  6. Testing and training

RESULTS

✅ 2 months from start to operation
✅ System working perfectly
✅ 150 ton/h confirmed
✅ Zero accidents
✅ Still operational (2020-2025)
✅ EPC capacity proof


IMPACT

This project proved complete engineering capacity, opening doors for POSH Arcadia EAS 2025 projects with structural project development.


DATA

  • Type: Turn-Key (EPC)
  • Capacity: 150 ton/h
  • Length: ~15 meters
  • Duration: 2 months
  • Status: Operating (2020-2025)

Your project demands absolute reliability. Engport delivers.

Certified team (ISO 9001, IRATA, AWS), track record of 150+ completed projects, and ability to operate in critical environments with Zero Downtime.
If you are looking for a flawless solution, on time and with full traceability, talk to our engineering team.