National Boilerwork and Offshore Support Services Contract - Subsea7 Brazil
- Client: Subsea7
- Location: SP, RJ, ES (5 states)
- Period: 2010-2014 (4 years)
- Category: OFFSHORE
HISTORICAL CONTEXT:
Executed by Tecnoporto (predecessor company), of which the current director of Engport was a partner. Expertise and methodologies are the foundation of the Engport Group.
THE OFFSHORE BOOM
2010-2014: golden era of Brazilian oil. Subsea7 expanded aggressively and found Tecnoporto as a local partner.
SCALE CHALLENGE
Simultaneously managing:
- 100+ employees
- 3 states (SP, RJ, ES)
- Multiple critical projects
FLAGSHIP PROJECTS
- Lula North and South Buoy Systems
- Sapinhoá Buoy System
- Overdrum Project
- Seven Oceans Vessel
SOLUTION: ORGANIZATIONAL STRUCTURE
Hiring and developing supervisors – 1 for every 8-10 professionals. This structure is still used today at Engport.
LEGACY
Although Tecnoporto closed during the Lava Jato crisis (2014), the experience was fully transferred to the Engport Group (founded 2020).
DATA
- Employees (peak): 100+
- Duration: 4 years
- States: 3
- Main projects: Lula North/South, Sapinhoá, Overdrum







